Thank you for your phone calls and emails concerning the Big Savage Tunnel. ATA is delighted that you are as excited about this project as we are. Thanks to the hundreds who have contributed to our sponsor a foot campaign.
As so often happens with construction, this project is taking much longer than anticipated.
To allow the contractors to do their jobs and to protect the safety of all, the Big Savage Tunnel is closed until further notice.
On-road detours are available on this website
or bear with us until spring when we can open the tunnel to trail
use.
Thank you for your interest and be assured that getting the tunnel open and the connecting trail constructed is number one on the list.
There are gates and signs that warn people that they are in a construction zone that is closed to the public on each end of the tunnel. From these points you can't even see the portals of the tunnel and the public is not permitted any further than this. People can ride to these points but must be aware that they may not enter the construction zone. Even though the bulk of the work is occurring inside the tunnel, there is still a great deal of activity outside each portal which could put someone at risk.
|