Groveton to McDonald - Completed |
McDonald to Venice - Construction under way. (Checked 10/6) |
Venice to Greer - Completed |
Greer to Rt. 19 - Design and engineering underway |
Rt. 19 to Library Jct. - Completed (Arrowhead Trail) |
Library Jct. to Brownsville Rd - Design and
engineering underway |
Brownsville Rd to Triphammer Rd - Completed |
Triphammer Rd to Snowden - Design and engineering
underway |
Snowden to Gill Hall - Completed - (Checked 8/18) |
Gill Hall to Large - Trail on existing low traffic road.
1.5 miles along level park road, .5 miles over small hill
(Checked 8/18) |
Large to Clairton - asphalt millings have been placed. Trail
usable. To be paved Fall 2002 (report 8/18) |
|
|
West End Bridge to Station Square - |
Alongside Station Square - Short trail - Completed |
Station Square to 9th St. - |
9th St. to east side of UPMC Sports Center - Completed -
(Checked 8/17) |
UPMC Sports Center to Sandcastle - Design and
engineering underway |
|
|
Alongside Sandcastle - |
Sandcastle to Lowes Theater - Acquisition of R/W
underway |
Lowes Theater to Lowes Building Center - (1 mile of
trail ) Completed |
Lowes Building Center to east edge of Waterfront - (1
mile of trail) Under construction 2001 (Checked 8/18) |
Waterfront to Kennywood Amusement Park -
Acquisition of R/W underway |
Kennywood Amusement Park to McKeesport - Design and
engineering underway |
McKeesport to Clairton - Signed for bike lanes and
shared roadway |
|
|
McKeesport Marina to 15th St. Bridge - Completed |
15th St Bridge to McKeesport city limits on east side
of Youghiogheny - Completed |
McKeesport city limits to Boston on east side of
Youghiogheny - use back streets near river (low traffic)
to Boston Bridge, then walk bikes on sidewalk across
bridge |
15th St. Bridge to Durabond Plant on west side
of Youghiogheny - use roadway |
Durabond Plant to Boston to Connellsville on west side
of Youghiogheny - Completed
|
|
|
Connellsville to Confluence - Completed |
|
|
Confluence to Salisbury Viaduct - Completed |
Salisbury Viaduct to Meyersdale - |
Meyersdale to Big Savage tunnel - Engineering underway |
Keystone Viaduct - Contract let Aug 8, Construction to Mid October
(Report 10/5) |
Big Savage Tunnel - Active Construction. Tunnel is closed to traffic. (Report 8/18) |
Big Savage Tunnel to State Line - Investigating
construction options |
|
|
State Line to Frostburg - Land has been acquired (Signed, sealed and
approved 10/15) - Design and engineering
underway |
Frostburg to Cumberland - Design and engineering
underway - Ongoing discussions with MTA (The steam train people) over